Labour accommodation in Yanbu means a licensed bed close to Yanbu Industrial City, the port or your project site, with meals, laundry, cleaning and bus transport run under one contract. This guide explains which licence your Yanbu building needs and who issues it, where crews should live, how shutdown and project peaks change the plan, and what to check before you move 50 or 350 workers in.
The short answer is a bed in a licensed collective housing facility, full board or a meal service, and the daily services that keep a crew rested, fed and on the bus at shift time.
Yanbu is an industrial town first, so the scope should be written around plant shifts, turnaround peaks and long distances to the next large city.
The national rules apply in Yanbu exactly as they do in Riyadh or Jeddah: establishments with 20 or more workers must house them in licensed collective housing.
Balady and Qiwa are linked electronically, and an establishment without a valid licence that matches its registered headcount and the building’s capacity risks having its commercial registration suspended.
The Ministry of Municipalities and Housing has set 1 February 2027 as the date from which establishments with fewer than 250 targeted workers must also provide licensed group accommodation, either in their own licensed building or through a licensed provider.
Licences are issued through the Balady platform, except for some sites inside industrial cities, which are licensed by the competent authorities there.
That exception matters in Yanbu more than in most cities, because many crews live inside or next to Yanbu Industrial City rather than in Yanbu al-Bahr.
Before you sign, ask the provider which authority licensed the exact building, the licence number and the licensed capacity, and check that the capacity covers your headcount.
Read the full guide to the group housing licence
The updated health, technical and safety requirements published in September 2026 cover residential buildings up to 23 metres, fenced residential complexes and mobile cabins on project sites.
Requirement | What it means for your Yanbu contract |
|---|---|
Bedroom space | At least 4 square metres per person and no more than 10 residents per room. |
Bathrooms | At least one bathroom with a toilet, sink and shower for every 8 residents. |
Meals | A central kitchen or a meal service must be provided. |
Dining and rest | A shared rest and dining room of at least 0.7 square metres per person. |
Supervision | A full-time Saudi supervisor with access to all facilities and knowledge of the emergency procedures. |
Fire safety | Civil Defence approval before the operating licence, an approved evacuation plan, extinguishers no more than 23 metres apart and exit signs that stay lit for 90 minutes in a power cut. |
Site cabins | Mobile cabins tied to a project may be used for the project’s duration or one year, renewable. |
Rooftops, corridors and basements may not be used to house people, which rules out the overflow arrangements some buyers still see in older buildings.
See the labour camp requirements checklist
Yanbu Governorate sits on the Red Sea coast in the Madinah region, and its industrial heart is Yanbu Industrial City, south of the old town of Yanbu al-Bahr.
Saudipedia lists fifty-eight major industrial complexes and 148 light and supporting industries in the industrial city, together with Yanbu Industrial Port, the largest crude oil export port on the Red Sea coast.
Most demand for beds comes from three groups of sites.
Crews working inside the industrial city should be housed as close to their gate as the licence allows, because security checks at plant entrances add time to every bus run.
Crews on projects in Yanbu al-Bahr or along the coastal road can live further north, where the bus journey is shorter and more housing stock is available.
Ask for the bus time from the accommodation to your actual gate at the real shift start, including the security check, before you compare rates.
A cheaper bed that adds forty minutes a day per worker is rarely cheaper by the end of the month.
Yanbu’s refineries and plants run planned shutdowns and turnarounds, and each one brings a short, sharp peak of mechanical, electrical and scaffolding crews who all need beds at once.
Expansion work adds longer peaks: the Yanbu refinery’s venture framework agreement covers a 1.8 million tonne per year ethylene plant and a 1.5 million tonne per year aromatics plant, both built on the existing site.
For buyers this means four practical things.
Requests in the last few weeks show the range BICC sees in Yanbu, from a few inspectors who need rooms, an office and storage to licensed beds for 350 drivers.
Yanbu is about 200 kilometres west of Madinah and 1,047 kilometres from Riyadh, so a crew that arrives without beds cannot simply be moved to another city for the night.
Prince Abdulmohsin bin Abdulaziz Airport lies about 30 kilometres from the city centre, which helps with rotations, but most mobilisations still arrive by road.
That distance shapes the contract in three ways.
Rates vary with the building, the services and the timing, so it is more useful to understand the factors than to compare one headline number.
Cost factor | Why it moves the price |
|---|---|
Room occupancy | Fewer people per room means more space per person and a higher rate per bed. |
Distance to the gate | Beds inside or next to the industrial city usually cost more but save bus time every day. |
Meal plan | Three meals with gate delivery cost more than breakfast and dinner at the accommodation. |
Timing | Beds booked during an overlapping turnaround season are scarcer than beds booked for a steady crew. |
Contract length | Longer terms spread set-up costs and usually lower the daily rate. |
Transport | Shift pattern, number of gates and bus size all add to the cost. |
Licence and supervision | A licensed building with a full-time Saudi supervisor costs more than an unlicensed villa, and the gap is the price of avoiding violations. |
See how labour catering is priced per person per day
BICC (Basr International Contracting Co.) runs its own camp in Yanbu, so the licence, the kitchen and the resident team are already in place when your crew arrives.
Meals from our ISO 22000 kitchen, laundry, cleaning, maintenance, security and transport come under one agreement, with one monthly invoice and one point of contact.
For turnaround peaks we plan bed counts week by week with you, and if you also need workers we can second Ajeer manpower under our Platinum Nitaqat sponsorship.
Send your headcount, dates and gate location, and you will have a plan and quotation within 48 hours.
Yes. Licensed collective housing exists inside and next to the industrial city, and buildings inside it may be licensed by the competent authority there rather than through Balady, so always ask which authority issued the licence.
From 1 February 2027 establishments with fewer than 250 targeted workers must also provide licensed group accommodation, either in their own licensed building or through a licensed provider.
No more than 10, with at least 4 square metres of bedroom space per person and one bathroom for every 8 residents.
Yes, if it has its own camp in Yanbu and the peak is booked early, with a minimum occupancy and a weekly bed plan agreed in the contract.
Yes. Lunch is packed in insulated containers and delivered to the gate or a site canteen at agreed times, with night-shift meals planned separately.
BICC sends a plan and quotation within 48 hours of receiving the headcount, dates and gate location.
Sources: Sabq, on the 20-worker rule, the Balady and Qiwa link and licensing inside industrial cities, People Matters, November 2026, on the 1 February 2027 deadline, Amlak, September 2026, on the updated group housing requirements, Saudipedia, Yanbu Governorate, Sinopec and Aramco, on the Yanbu refinery expansion, Enterprise, July 2025, on the Yanbu desalination plant
Tell us the headcount, dates and gate location, and we will send a plan and quotation within 48 hours.